There are very frequent blocks on this route including this integrating corridor block i.e. total stoppage of traffic on all 3 tracks. If the traffic is so heavy that the regular maintenance is not possible, then why not to take-up up the proposed 4th line project at the earliest. This section is a part of Bilaspur- Nagpur route on which Semi High Speed Trains are supposed to run.