i think nemom planned to developed so till vilinchiyam port TVC division can have. so from NYY/ parasala MDU can take. but problem is TVC doesnt have sufficient infra to maintain its trains. even if SCT (infra)given they will hardly gain infra than they losed. In other side MDU will get NCJ with TEN infra MDU can get better trains. but really gets problem what sort of trains will be given to where. since NCJ near by to TVC they got almost many connections on their shadow. those type tourist connections may not be ensured in MDU as CAPE has to fight with Tuticorin, rameshwaram for long tourist trains. so in my opinion. it will be big loss for CAPE dt too. Even if those lines comes to MDU division. what will be the trains given to kulithurai and eraniel? what will be developed there? i dont think both have space...
more... for development. it is political move to pacify CAPE people that TVC didnt cared to MDU will care. MDU can maximum get one MS train for them. so for 1 MS train they creating so much hatred state politics. worst mindset.