Should be speeded up and reach CBE by 2315.
When a train starting at 2035 at CSMT can reach Salem in 23.5 hours, why this train starting at 2230 should take 23.5 hours to reach Bangalore?
I am referring to CSMT TVC starting at 2035 which reaches KJM in outer of bangalore by 1550, and Coimbatore by 2345. Means 26 27 hours. But this useless AC crawler takes 32 hours with LHB coaches ЁЯШТ