🟩New Signalling Electronic Interlocking (EI) system commissioned on 01/11/23 at BHUGAON station in connection with commissioned Wardha-Ballarshah 3rd line at Bhugaon.
🟩2 new additional loop lines of 750 meters length each commissioned at Bhugaon station.
...
more...
Features of new infra works completed at Bhugaon station on 01/11/23-
✅Earthwork- 32500 Cum
✅2 new loop lines of 750 mtr length each
✅2 new stabling sidings of 70 mtr each
✅8 new track turnouts
✅2 new crossover switch
✅New signalling system routes provided- 63
✅New point machines- 24
✅New Track circuits- 46
✅New main signals -26
✅New Shunt signals -11
✅EI of M/s Hitachi Rail make commissioned with latest RDSO TAN and Latest cyber security TAN
✅2 set of Statcon IPS with 300AH battery for each set provided
✅BPAC (Block proving axle counter) provided for Dual detection in UP, DOWN & New 3rd lines to ensure train safety. The new system will ensure complete clearance of previous train from the section at next station before allowing another train from previous station
✅100% standby fuse provided
✅Efftronics Data logger with 1024 digital contacts and 32 analog contacts provided
✅Fire alarm system provided at station
CR is committed for continuous upgradation of system to improve safety & mobility of trains.