Bangalore Mumbai needs 2 new SF LHB daily trains apart from daily VB SL. Chennai all three trains capacity to be increased to 22 coaches and a New VB SL, Hyderabad both trains capacity to 22 and a daily VB SL and increase in frequency of Duronto to Triweekly with change in timings to 2000 dep and 800 arrival on both sides.