Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Fri Sep 20 18:13:56 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 5978942
Posted: Feb 25 (19:14)

No Responses Yet
Rail News
12329 views
0

IR Affairs
NER/North Eastern
Feb 25 (19:14)   Bridge and Track Construction in Rambag-Jhusi Section Delayed by Three Months

AdittyaaSharma^~   73768 news posts
Entry# 5978942         Tags   Past Edits
रामबाग-झूंसी के बीच ट्रैक का काम तीन महीने पिछड़ा

The construction of the bridge and track in the Rambag-Jhusi section of the Northeast Railway has been delayed by three months. The Northeast Railway had initially aimed to complete all work in the section by March this year, but due to the Magh Mela, the deadline has been extended to June....
more...
Currently, 90% of the work on the track has been stalled for a month. The IVRCL, the company contracted for the construction, has completed 90% of the bridge over the Ganges near Sangam. However, the construction of the road overbridge for the second track has been halted due to the Magh Mela. As a result, the track could not be laid on the bridge. The construction of the road bridge has been stopped at several places due to the construction of pillars. A company official mentioned that vehicular movement on the route needs to be stopped to construct the second track bridge. The administration, citing the Magh Mela, has not given permission for route diversion. The key point is that all the routes for the road overbridges for the second line are linked to the Sangam. Permission for diversion will now be sought. The work of laying the track along with the road bridge will be completed by June.

Northeast Railway ke Rambag-Jhusi section mein bridge aur track ka kaam teen mahine late chal raha hai. Railway ne is saal March tak sabhi kaam complete karne ka target set kiya tha, lekin Magh Mela ki wajah se June tak deadline extend kar di gayi hai. Abhi track par 90%...
more...
kaam ek mahine se band hai. IVRCL, jo construction ka contract liya hai, ne Sangam ke paas Ganga par bridge ka 90% kaam complete kar diya hai. Par, dusre track ke liye road overbridge ka kaam Magh Mela ki wajah se rokna pada hai. Is wajah se bridge par track nahi bichha paya. Road bridge banane ke liye kai jagah pillar banne ke kaam se rok diya gaya hai. Company ke ek officer ne bataya ki dusre track ka bridge banane ke liye raaste par vehicle movement rokna hoga. Administration ne Magh Mela ka havala dete hue route diversion ki permission nahi di hai. Main point yeh hai ki dusri line ke liye sabhi road overbridges ke route Sangam se link hai. Ab diversion ki permission maangi jaayegi. June tak road bridge ke saath track bichhane ka kaam complete ho jaayega.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

1959644 ★★★ 270Arpit~
6191858  13SreeNdl^~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy